SPEC PIPELINE CALCULATOR
How many specs your target needs
Work backwards from a revenue target to the specifications you need to win, and the months you need to win them in.
Made for building product manufacturers. Six figures give you the answer, and the detailed view adds win rates, named specs and your team's workload.
Six figures, one answer.
Your result appears here
Add your figures to see how many specs you need and when to win them.
Not sure of some figures?
That’s a good place to start
You weren’t sure of some figures.
Figures like these are often hard to find, because the spec and the order usually sit in different systems. Working them out from your CRM, quotes and orders is part of the growth diagnostic.
Or add a best guess to see a rough answer now.
Specs to win
0
to win for your revenue target
When they need winning
The months to win them in appear here.
Where you are in the window appears here.
When higher-risk specs need winning appears here.
The funnel behind it
How many projects your team chases for each order appears here.
What moves the number
What one point of hold rate is worth appears here.
The workload
The load per person appears here.
You weren’t sure of some figures.
See how the growth diagnostic worksBook a 20-minute call. Your figures go into the booking notes.
Copy text appears here if your browser blocks copying.
How the calculator works
Orders needed = revenue target ÷ order value, rounded up.
Specs to win = orders needed ÷ (share that go ahead × share that hold), rounded up. In the detailed view the hold rate blends your named and “or equivalent” rates by how often you're named alone.
Projects to chase = specs to win ÷ the share of chased projects where you get specified.
The window runs from the start of the order year minus your typical time from spec to order, to the end of the order year minus the same time. The wider band uses your quickest and slowest times.
Higher-risk buildings blend into the hold rate by the share of your projects that are higher-risk. Their window starts from the Gateway 2 submission when that comes earlier than your usual time from spec to order.
- It uses only the figures you enter. They stay in your browser unless you copy a link or book a call, when they go into the booking notes.
- It counts a spec as landing when its first order arrives. Orders that call off in stages over a build still count once.
- It leaves out repeat orders, framework agreements and orders that arrive without a specification.
- It assumes specs are won at a steady rate through the window.
- It keeps your order value the same between winning the spec and taking the order, even though prices can move in the 18 months or more between them.
AFTER THE CALCULATOR
Turn the number into a plan
Knowing how many specs you need is the start. Hitting the number depends on who you target, how well your specs hold and whether your systems show what's working.
That's the work I do with building product manufacturers, drawing on my time leading digital strategy at Knauf.

